Air Conditioning Challenge August 2005
When our sanctuary air conditioning failed during the 90 degree heat of summer, the church membership rose to the occasion. While waiting for the repairs, church services were held in the Jim Reed Building. It was a full house and truly the feeling of a strong church at work was felt by all.